Overview
Use Anaheim Building Division’s current Fees landing page and scope-specific application requirements. Classify structural changes and individual trades before selecting a fee exhibit.
Authority
Anaheim Building Division
Listed permit minimum
$188 in offered miscellaneous schedule
Trades
Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.
Electrical permit categories
Anaheim Building DivisionApplicable Code
Applicable adopted electrical requirements.
License Requirement
Appropriate CSLB electrical scope or verified owner route.
License Fee
State classification schedule
CEUs
Verify renewal requirements
Permit Fee
Current electrical fee not verified; excluded from the worked example. Use Exhibit C electrical categories; new residential square-foot rows differ by occupancy.
Plan Review Time
Express service covers eligible electrical Building Division review.
Common Pitfalls
- Single/two-family and multifamily new-building rows differ.
- Additional or complex work can need a Building Official assessment.
Permit-to-closeout workflow
Define work
Replacement, new opening, structural or trade scope
Check approvals
Planning and Building requirements for the property
Prepare plans
City forms, dimensions and discipline documents
Submit review
Complete review and any required deposit account
Issue and inspect
Pay assessed fees and arrange construction stages
Close out
Resolve corrections and applicable occupancy approvals
Permit fees and worked estimates
These are actual City PDFs offered on the current Fees page, checked October 12, 2026. The recovered sheets do not explicitly state an effective date, so confirm the operative assessment before budgeting.
| Trade | Permit fee | License fee |
|---|---|---|
| Electrical permit categories | Current electrical fee not verified; excluded from the worked example. Use Exhibit C electrical categories; new residential square-foot rows differ by occupancy. | State classification schedule |
| Fixtures, gas and equipment | Current plumbing fee not verified; excluded from the worked example. Use Exhibit E fixture, heater, sewer and gas rows; additional review/inspection may apply. | CSLB licensing schedule |
| Mechanical equipment and ventilation | Use the offered mechanical exhibit and equipment scope; miscellaneous inspection service is listed at $188/hour with stated minimums. | State specialty schedule |
| Fire review boundaries | Current fire fee not verified; excluded from the worked example. Obtain Fire-system fees separately; Building Express pricing does not establish Fire pricing. | System credential schedule |
| Miscellaneous building scopes | Offered miscellaneous sheet lists $95 window replacement plus $20 each additional replacement; new openings have different fees. | CSLB classification schedule |
Submission checklist
Homeowner and codes
Confirm owner-builder eligibility and accepted City code requirements. The miscellaneous schedule differentiates light re-roofing, structural tile work and other scopes; structural documents can be required even for replacement work.
Inspections and closeout
Arrange required stage inspections and resolve corrections before concealing work or finalizing the project. The sheet lists separate after-hours, weekend and reinspection services; temporary occupancy is an assessed service requiring eligibility, not an automatic approval.
