City GuideHouston, TXOfficial resources checked 2026-10-12

Houston Contractor Licensing & Permit Guide (2026)

Plan Houston building and trade applications, dated fee components, historic approvals and inspection coordination.

Houston, Texas Skyline 2017
Photo: Jason Villanueva · CC BY-SA 4.0 · Resized for this guide.

Confirm current licensing, code editions, fees and project requirements with the issuing department before starting work.

Overview

Houston Building Code Enforcement’s current Plan Review service offers residential One-Stop, fast-track and new single-family/duplex routes. Its online One-Stop instructions direct applicants to apply in iPermits, upload plans and required documents in ProjectDox, include supporting forms and respond to review comments. Use the route’s eligibility instructions before submitting.

Building authority

Houston Permitting Center / Building Code Enforcement

Online application systems

iPermits application + ProjectDox plans and review comments

Trades

Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.

Electrical service and installation

Houston BCE / Texas TDLR

Applicable Code

Confirm Houston’s electrical amendments and filing-date NEC requirements with BCE.

License Requirement

Use the appropriate Texas electrical contractor and individual credentials; confirm Houston registration before purchase.

License Fee

TDLR license-class fees; Houston registration is separate

CEUs

Covered individual electrical licenses: 4 hours per renewal; contractor licenses are exempt.

Permit Fee

2026: meter/service ≤50 kW $94; outlets $1.34 each; $91.06 minimum; applicable administration extra.

Plan Review Time

Electrical review depends on the scope; the 2022 City presentation is not a current turnaround promise.

Common Pitfalls

  • A service-only fee does not include additional panels, devices or fixtures.
  • The registered trade contractor coordinates the trade inspection in the documented City workflow.

Permit-to-closeout workflow

01

Confirm the property and scope

Identify the building work, trade systems, historic restrictions and other approvals.

02

Apply through iPermits

Use the current Plan Review service and the appropriate residential application.

03

Upload plans in ProjectDox

Include all required forms and supporting documents for the selected route.

04

Resolve review comments

Complete required corrections and obtain all applicable approvals.

05

Obtain building and trade permits

Pay assessed charges and have the responsible contractors obtain their permitted scopes.

06

Inspect and complete

Coordinate each required inspection and any occupancy approval with the relevant section.

Permit fees and worked estimates

The live City schedule dates these rates January 1, 2026. This is a component example, not a project quote.

Service-only electrical example, ≤50 kW: $94 permit component + $33.56 applicable administrative component = $127.56. The $91.06 electrical minimum is below the $94 service component. Assumes one permit and no other devices, plan review, other permits or special inspections. Confirm administrative applicability and the final invoice with HPW.
TradePermit feeLicense fee
Electrical service and installation2026: meter/service ≤50 kW $94; outlets $1.34 each; $91.06 minimum; applicable administration extra.TDLR license-class fees; Houston registration is separate
Plumbing and water systems2026 plumbing minimum $97.56; fixture/system charges and applicable administration are additional considerations.TSBPE credential fees and applicable Houston registration
HVAC installation and alteration2026 repair/alteration component: $47 base + 2% valuation; minimum and administration may apply.TDLR contractor class and City registration requirements
Fire alarms and sprinkler systems2026: alarm 1–10 devices $91.06; sprinkler first 25 heads $97.56; review $2.28/head.System-specific state credential and City registration
Building and historic-property coordination2026 general minimum $91.06, excluding plumbing; actual building charges depend on the permit.GC license not required for building permit; trade registration is separate

Submission checklist

Confirm the property address and full proposed building/trade scope.
Prepare the plans, application declarations and supporting property information required by HPC.
Identify floodplain, utility, site-development and historic approvals that affect the project.
For historic exterior changes, prepare the COA application, photographs, materials and dimensioned existing/proposed drawings.

Homeowner and contractor rules

Houston’s current Plan Review page states that a general contractor license is not required for building permits, while electrical, plumbing and mechanical contractors must register their licenses with the City. Confirm homeowner eligibility for each trade rather than using the GC rule as a trade exemption. Before new residential intake, check development-plat review and water/wastewater availability where needed.

Codes and local amendments

The Permitting Center is the City-linked construction-code authority. Use its applicable Houston Construction Codes resources to confirm discipline-specific editions, amendments and filing transitions. The GC licensing rule does not remove code, inspection or property requirements.

Historic enforcement pitfalls

Exterior work on a designated historic property may require a COA even when the work seems minor.
Work outside the approved COA can result in a stop-work order, removal or restoration requirements.

Inspections and closeout

The dated City workflow separates structural and trade inspections and assigns trade scheduling to the registered contractor who purchased the permit. Confirm the present scheduling instructions and required finals with the appropriate inspection section. A completed building review does not close every trade record or establish occupancy approval.

Official resources

Houston contractor licensing and permit guide | PermitOps