Kansas City Contractor Licensing & Permit Guide (2026)

Use CompassKC applications, City contractor qualification and codified construction valuation fees for Kansas City, Missouri projects.

Kansas City, MO skyline at night
Photo: Lasse Fuss · CC BY-SA 3.0 · Resized for this guide.

Confirm current licensing, code editions, fees and project requirements with the issuing department before starting work.

Overview

Kansas City, Missouri Planning & Development requires all applications in CompassKC. Walk-in applicants must apply online first and bring their application number or site information. This guide does not describe Kansas City, Kansas.

Authority

City Planning & Development

Applications

CompassKC for all applications

Trades

Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.

Electrical permits and reconnects

Kansas City Planning & Development

Applicable Code

City electrical provisions within the Building and Rehabilitation Code.

License Requirement

Confirm City electrical contractor qualification with licensing staff.

License Fee

City licensing charge not independently verified.

CEUs

Applicable City credential renewal requirements

Permit Fee

Section 18-20 uses separate electrical valuation categories; existing-service reconnect inspection $54, potentially credited if permitted work is required.

Plan Review Time

Apply in CompassKC and coordinate plan review where required.

Common Pitfalls

  • Reconnect inspection is not a complete new electrical permit quote.
  • Kansas City, Kansas credentials and permits are a different jurisdiction.

Permit-to-closeout workflow

01

Confirm Missouri City jurisdiction

Check property location, proposed use and development approvals.

02

Prepare project scope

Identify each building, trade and associated valuation.

03

Apply in CompassKC

Submit the application before seeking walk-in assistance.

04

Complete review and payment

Resolve comments and pay assessed charges before permit validity.

05

Inspect construction

Arrange City and required special inspections.

06

Obtain occupancy approval

Request finals and the applicable certificate before use.

Permit fees and worked estimates

The City-linked Section 18-20 body was reviewed in the codifier version marked June 25, 2026 current. That version date is not a newly asserted effective date for each rate.

Assume one qualifying detached one/two-family building permit with accepted total valuation $10,000: $58 + 8 × $4.33 = $92.64 valuation-based permit component. Excludes separately assessed trades, site/development fees, special services and any applicable additional charges.
TradePermit feeLicense fee
Electrical permits and reconnectsSection 18-20 uses separate electrical valuation categories; existing-service reconnect inspection $54, potentially credited if permitted work is required.City licensing charge not independently verified.
Plumbing and water-service distinctionsCurrent project-specific plumbing fee amount not verified; excluded from the worked example. Section 18-20 values plumbing work separately; detached one/two-family and other buildings have different brackets.City licensing amount not verified.
Mechanical systems and valuationFor a qualifying detached one/two-family mechanical permit valued $2,001–$100,000: $58 plus $4.33 for each additional $1,000 or fraction above $2,000.City licensing amount not verified.
Fire-protection permits and acceptanceCurrent project-specific fire-system fee amount not verified; excluded from the worked example. Section 18-20 includes fire-protection permits in the building-category valuation tables; other required fees remain separate.System qualification charge not verified.
Buildings and certificates of occupancyDetached one/two-family valuation $2,001–$100,000: $58 plus $4.33 per additional $1,000 or fraction above $2,000.City licensing amount not verified.

Codes and amendments

Use the City Building and Rehabilitation Code and applicable amendments. The official permit page directs applicants to its codified fee provisions. Confirm project-specific technical editions with the reviewer.

Submission checklist

Confirm the Missouri City boundary and proposed use.
Provide required construction documents and separate structure valuations.
Verify the accepted contractor or owner applicant.
Apply in CompassKC before visiting City Hall for assistance.

Homeowner rules

Confirm the exact owner exemption and City permit eligibility before taking responsibility for work. The codified owner exception to certain after-the-fact penalties does not establish a blanket exemption from permits or trade qualification.

Inspections and closeout

The permit holder must request final inspection and apply for a certificate of occupancy where required. Section 18-23 prohibits use before the required certificate. Not-ready or unresolved repeat inspections can attract charges; confirm special-inspection responsibilities.