Confirm current licensing, code editions, fees and project requirements with the issuing department before starting work.

Overview

The Shelby County official site redirects to Develop901 Construction Enforcement, whose actual body confirms service for Memphis and named neighboring areas. This joint construction authority does not erase separate municipal zoning or outside-agency approvals.

Authority

Joint Memphis and Shelby Construction Enforcement

Services

Develop901 / Accela citizen permit tools

Trades

Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.

Electrical permits and joint-office registration

Memphis-Shelby Construction Enforcement

Applicable Code

Joint-office electrical code and amendments; confirm the actual adopted cycle.

License Requirement

Appropriately licensed electrical contractor registered with the joint office.

License Fee

State/local registration category schedule

CEUs

Credential issuer requirements

Permit Fee

Current project-specific electrical fee amount not verified; excluded from the worked example. Use the offered schedule’s electrical section; building valuation rates are not electrical equipment rates.

Plan Review Time

Coordinate plans with the building scope and electronic record.

Common Pitfalls

  • State licensing and joint-office registration are separate checks.
  • Contractor must secure the scope permit before installation.

Permit-to-closeout workflow

01

Confirm service jurisdiction

Check joint-office coverage and local zoning requirements.

02

Prepare plans

Include code analysis, scaled drawings and design-professional documents where required.

03

Apply electronically

Use Construction Enforcement instructions and the citizen permit route.

04

Complete review and registration

Resolve comments, update contractor records and pay assessed charges.

05

Inspect building and trades

Each trade secures its scope permit before installation.

06

Close out

Clear required construction and agency finals before occupancy.

Permit fees and worked estimates

The actually offered nine-page fee document is labeled 2022; no refreshed 2026 rate commencement is claimed.

Assume accepted $20,000 commercial construction scope in the listed first band: 20 × $5 = $100, above $75 minimum; plus $4 administrative and $5 commercial surcharge = $109 building component. Excludes separate plan review, trade/system permits and outside-agency charges. Confirm current assessment.
TradePermit feeLicense fee
Electrical permits and joint-office registrationCurrent project-specific electrical fee amount not verified; excluded from the worked example. Use the offered schedule’s electrical section; building valuation rates are not electrical equipment rates.State/local registration category schedule
Plumbing applications and inspectionsCurrent project-specific plumbing fee amount not verified; excluded from the worked example. Confirm plumbing fixture/scope and administrative charges in the joint fee assessment.Applicable state/local schedule
Mechanical and gas systemsCurrent project-specific mechanical fee amount not verified; excluded from the worked example. Use the mechanical/gas equipment categories; confirm added office charges.State/local credential schedule
Fire and life-safety coordinationCurrent project-specific fire-system fee amount not verified; excluded from the worked example. Confirm fire/system review separately from Construction Enforcement building charges.System credential schedule
Buildings and coordinated plan reviewOffered 2022 commercial building through $25,000: $5/$1,000 with $75 minimum; add $4 administrative + $5 commercial surcharge.Applicable credential/registration schedule

Codes and amendments

The joint-office general submittal PDF identifies 2021 IBC/local amendments effective January 1, 2022. Confirm current scope-specific technical codes with the reviewing office rather than applying that building edition to every trade.

Submission checklist

Submit electronic plans and required review payment.
Provide scaled drawings and code/use information.
Obtain required design-professional documents.
Keep contractor state, business and office registration current.

Homeowner rules

Confirm the joint office’s owner-builder eligibility and permit-holder requirements before filing. The City/County construction relationship does not create a universal self-perform exemption.

Inspections and closeout

Use the citizen permit record and joint-office instructions, obtain each trade permit before installation and arrange required inspection stages. Clear construction and outside-agency final conditions before occupancy.