City GuideMiami, FLOfficial resources checked 2026-10-12

Miami Contractor Licensing & Permit Guide (2026)

Plan City of Miami building and trade applications, digital review, construction fees and inspection closeout.

Miami, Florida skyline
Photo: Wilfredor · CC0 · Resized for this guide.

Confirm current licensing, code editions, fees and project requirements with the issuing department before starting work.

Overview

The City of Miami Building Department serves properties inside the City. Miami Beach and unincorporated Miami-Dade have separate authorities. The City applies Florida codes and relevant Miami-Dade construction requirements; that does not make the County the issuer of every City permit.

Jurisdiction

City of Miami; not Miami Beach or unincorporated Miami-Dade

Permit authority

City Building Department

Trades

Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.

Electrical permits and contractor scope

Miami Building / Florida DBPR

Applicable Code

2020 NEC with applicable Florida and local administrative provisions.

License Requirement

Verify the Florida electrical contractor category and the business qualifier; specialty or alarm licensing has a limited scope.

License Fee

DBPR electrical-contractor schedule

CEUs

Use the electrical category’s DBPR renewal curriculum

Permit Fee

2026 Exhibit C: residential up to 3 units 0.50% of construction cost; commercial up to $30 million 1%; $110 minimum and $40 application component, before surcharges.

Plan Review Time

Stand-alone versus subsidiary trade routing affects the application; confirm plan requirements.

Common Pitfalls

  • Identify whether the electrical permit depends on a master permit.
  • Include labor and materials in the declared construction cost.

Permit-to-closeout workflow

01

Confirm the jurisdiction

Identify City of Miami property, zoning and the complete building/trade scope.

02

Prepare the application

Choose the master, subsidiary trade or stand-alone application and responsible contractor.

03

Submit plans

Use iBuild and the City’s ProjectDox instructions for digital drawings and supporting approvals.

04

Complete review and payment

Resolve comments and obtain each issued permit; other agencies and surcharges can apply.

05

Arrange inspections

Use the Building Department inspection service and keep approved project documents available.

06

Complete the certificate

Confirm whether the finished scope needs a certificate of occupancy or completion.

Permit fees and worked estimates

The City identifies R-26-0200, adopted April 23, 2026, as its current schedule. Exhibit C provides actual rates; its template adoption blanks should be read with that official publication statement. These are components, not a complete invoice.

Assume a residential project of up to 3 units with accepted construction cost $50,000, no waiver or private-provider credit: $50,000 × 0.005 = $250; plus $40 application = $290. Excludes solid-waste/energy charges, state/county surcharges, other permits and certificate charges.
Avoid applying the general $110 minimum mechanically to the separate under-$2,500 residential row; ask the City how that special category is assessed.
TradePermit feeLicense fee
Electrical permits and contractor scope2026 Exhibit C: residential up to 3 units 0.50% of construction cost; commercial up to $30 million 1%; $110 minimum and $40 application component, before surcharges.DBPR electrical-contractor schedule
Fixtures, piping and gas coordination2026 Exhibit C: residential 0.50% / commercial 1% construction-cost basis for plumbing, with $110 general minimum and $40 application component; special categories and surcharges separate.DBPR construction-industry application schedule
HVAC equipment, ducts and ventilation2026 mechanical permit: 0.50% residential up to 3 units or 1% commercial up to $30 million; surcharges and minimums remain separate.DBPR category-specific schedule
Alarm, sprinkler and life-safety coordinationBuilding Department Exhibit C lists a $57 reinspection component. This is not a complete fire-system permit quote; request the system-specific assessment.System-specific credential schedule
Building construction and renovationsA $50,000 residential construction-cost basis gives $250 at 0.50%, plus $40 application = $290 component subtotal; exclude city/state/county surcharges and other approvals.DBPR firm and qualifier schedule

Codes and amendments

The Building Department identifies the 2023 eighth-edition Florida Building Code volumes, 2020 NEC and eighth-edition Florida Fire Prevention Code. Confirm project-specific local, flood and environmental requirements with the reviewing departments.

Submission checklist

Confirm City jurisdiction, property and intended use.
Identify master, stand-alone and subsidiary trade applications.
Prepare drawings and documents for ProjectDox.
Verify contractor credentials and any owner-applicant procedure.
Coordinate zoning and outside-agency approvals identified for the scope.

Homeowner rules

The City’s free Homeowner Assistance Program is available to homesteaded residential properties. Use that service to confirm owner-builder eligibility, required signatures and trade responsibilities before applying; assistance does not waive permits or contractor qualifications.

Enforcement and scope changes

The Department handles unsafe structures, violations and recertification. Resolve existing conditions and revisions through the appropriate City service. The Annual Facility Permit program has defined scope limitations and cannot be used for occupancy changes or as a substitute for every new project permit.

Inspections and closeout

The City provides inspection requests, inspection history and certificate services. Its department page distinguishes a CO for new construction or changed use from a CC for remodels, renovations and shell buildings. Confirm the required finals before requesting the certificate.

Official resources