Nashville Contractor Licensing & Permit Guide (2026)

Coordinate Metro Nashville-Davidson building review, separate trades, agency signoffs and Use and Occupancy closeout.

Skyline of Nashville, Tennessee - panoramio
Photo: dokaspar · CC BY-SA 3.0 · Resized for this guide.

Confirm current licensing, code editions, fees and project requirements with the issuing department before starting work.

Overview

Metro Codes is the coordinating agency for Nashville-Davidson construction permits. A Zoning Examiner identifies required agency approvals and issuance steps.

Authority

Metro Codes and Building Safety

Jurisdiction

Nashville-Davidson Metro permitting

Trades

Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.

Electrical and low-voltage work

Metro Codes

Applicable Code

Metro-adopted electrical code and amendments; confirm scope-specific edition.

License Requirement

Licensed subcontractor obtains the trade permit; confirm Metro license/bond review.

License Fee

Metro/state credential category schedule

CEUs

Issuer renewal requirements

Permit Fee

Current project-specific electrical fee amount not verified; excluded from the worked example. Electrical is a separate fee and permit in the linked Codes schedule; do not substitute building valuation charge.

Plan Review Time

Trade issuance follows the building record as directed.

Common Pitfalls

  • e-plan drawings and ePermits are different functions.
  • Low-voltage wiring can require separate permit and inspections.

Permit-to-closeout workflow

01

Check zoning

Identify permitted use and project requirements with the Zoning Examiner.

02

Submit the application

Use residential/commercial instructions and required electronic plans.

03

Obtain agency signoffs

Follow the examiner’s checklist for Metro reviews.

04

Arrange issuance

Confirm contractor, bond/license review and payment.

05

Inspect building and trades

Use issued inspection checklist and separate trade permits.

06

Obtain Use and Occupancy

Contact the division after all required final inspections.

Permit fees and worked estimates

The process page currently links an eight-page Codes schedule in a December 2022 URL. It does not provide a separate refreshed commencement statement; confirm the current assessment.

Assume qualifying one-family residential construction with accepted $100,000 valuation and the stated plan-review exemption: $500 valuation + $50 technology + $25 zoning = $575 component subtotal. Excludes separate trade permits, other agencies and impact/utility charges.
TradePermit feeLicense fee
Electrical and low-voltage workCurrent project-specific electrical fee amount not verified; excluded from the worked example. Electrical is a separate fee and permit in the linked Codes schedule; do not substitute building valuation charge.Metro/state credential category schedule
Plumbing fixtures and connectionsLinked schedule: plumbing minimum $75; fixture component $11, heater $43, water/sewer connection $80 each.Applicable license schedule
Gas and mechanical applicationsLinked gas/mechanical schedule: $75 minimum and $32 per 100,000 BTU or fraction for listed HVAC equipment scope.Trade category schedule
Fire life-safety coordinationCurrent project-specific fire-system fee amount not verified; excluded from the worked example. Obtain system assessment; separate agency and trade charges can apply.System credential schedule
Building review and occupancyLinked schedule: qualifying one/two-family or townhouse construction $5/$1,000 valuation, 10% Codes technology and $25 zoning; applicable review rules separate.Metro contractor renewal schedule

Codes and amendments

Confirm Metro’s adopted-code list and application-specific zoning requirements. Fee text referencing a historical IRC definition is not evidence that the same edition governs every present design.

Submission checklist

Confirm use and zoning with the examiner.
Prepare required plans through the instructed e-plan route.
Complete every assigned agency signoff.
Confirm contractor/bond/license review and trade records.

Homeowner rules

Metro states that an owner presently occupying or intending to occupy a single-family residence may obtain its building permit. Confirm self-permit approval with Permit Issuance; this does not grant unlimited regulated trade authority.

Inspections and closeout

An inspection checklist accompanies building issuance. Separate electrical, plumbing, gas/mechanical and low-voltage permits/inspections may be needed. After all required finals, contact the Use and Occupancy Division.