Overview

Safety & Permits uses One Stop for applications, tracking, payments and inspection scheduling. Confirm the legal property address and complete work scope, including historic or other agency reviews. Plumbing authority and utility requirements must be established for the actual work.

Application portal

One Stop App

Electrical applicant

City Class A electrical contractor

Trades

Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.

City-licensed electrical work

New Orleans Safety & Permits

Applicable Code

Applicable adopted City electrical and Louisiana requirements.

License Requirement

City page requires a Class A Electrical License holder to obtain the electrical permit.

License Fee

Current license fee not verified; separate from permit example.

CEUs

Confirm City and state credential renewal requirements.

Permit Fee

City page updated May 11, 2026: $40 application + $3 per new circuit + $0.30 per service ampere.

Plan Review Time

Declare service amperage, new circuits and related building-permit needs.

Common Pitfalls

  • Owner status does not override the stated Class A applicant restriction.
  • Six months of inactivity requires reapplication under the posted electrical guidance.

Permit-to-closeout workflow

01

Check property

Recognized address, use, flood and historic constraints

02

Define permits

Building, separate trades and related agency approvals

03

Prepare documents

City digital standards and scope drawings

04

Submit One Stop

Complete intake and answer review comments

05

Pay and inspect

Approved assessment, issuance and required construction stages

06

Finish records

Trade finals and applicable occupancy approvals

Permit fees and worked estimates

The live electrical service page was updated May 11, 2026 and retrieved October 12, 2026. Other charges depend on the scope and required approvals.

Assume an electrical application with two new circuits and a 200-amp service: $40 + 2 × $3 + 200 × $0.30 = $106 in posted components. City page updated May 11, 2026. Excludes construction loops, signs, elevators, related building/trade permits and other charges; actual invoice controls.
TradePermit feeLicense fee
City-licensed electrical workCity page updated May 11, 2026: $40 application + $3 per new circuit + $0.30 per service ampere.Current license fee not verified; separate from permit example.
Plumbing and related permit scopeCurrent plumbing fee not verified; excluded from the electrical worked example.Current plumbing credential fee not verified.
Mechanical and gas-fired equipmentCurrent mechanical fee not verified; excluded from the electrical example.Current mechanical licensing fee not verified.
Fire review and acceptanceCurrent Fire-system fee not verified; excluded from the electrical example.Current system credential fee not verified.
Building and historic-site coordinationOffered undated City sheet lists $60 + $5 per $1,000 building valuation and additional review; effective-date freshness not independently verified.Current building contractor fee not verified.

Submission checklist

Recognized property address, intended use and full scope.
Plans and supporting documents meeting City digital standards.
Trade-license information and any required building application.
Historic, zoning, flood and other project-specific clearances.

Homeowner and codes

Verify an owner application route before taking responsibility for construction. Electrical permits specifically require City Class A contractors. Confirm the accepted Louisiana construction-code editions and local New Orleans amendments for the filing date. Time-limited emergency amendments require checking their period of applicability.

Inspections and closeout

Use One Stop for the correct permit and required inspection requests. Resolve trade and building corrections and obtain applicable occupancy approval. Download the issued permit after approval/payment; an approved application alone is not the completed project.

Official resources