City GuidePortland, OROfficial resources checked 2026-10-12

Portland Contractor Licensing & Permit Guide (2026)

Research Portland permit requirements, prepare plans and follow Development Hub PDX review.

City view of Portland
Photo: Spicypepper999 · CC0 · Resized for this guide.

Confirm current licensing, code editions, fees and project requirements with the issuing department before starting work.

Overview

Portland Permitting and Development (PP&D) administers city building permits. Portland also provides building-permit services for Maywood Park and some unincorporated Multnomah County areas; confirm the service jurisdiction for the specific property.

Application portal

Development Hub PDX (DevHub)

Electrical homeowner limit

Owner-occupied home; rental and ADU exclusions

Trades

Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.

Residential electrical and service work

Portland PP&D

Applicable Code

Oregon electrical requirements and Portland electrical provisions; the permit is separate from building work.

License Requirement

Contractors need both Oregon CCB and BCD electrical licenses. Homeowner work is limited to an individually owned, occupied home, excluding rental and ADU work.

License Fee

Oregon CCB and BCD licensing schedules

CEUs

BCD electrical-license renewal requirements

Permit Fee

July 10, 2026: first branch circuit without service/feeder = $174; each additional = $21. Three circuits: $216 + $25.92 state surcharge = $241.92; plan review adds 25% when required.

Plan Review Time

The residential electrical service page states issuance within 24 hours after payment; plan-review scopes use the separate submission route.

Common Pitfalls

  • Each new townhouse needs its own electrical permit.
  • Inspection 199 Final Electrical Permit is required to approve and close the record.

Permit-to-closeout workflow

01

Research site

PortlandMaps parcel, zoning, existing use and permit history

02

Choose permits

Building, trade, zoning, site and Fire & Rescue as needed

03

Apply in DevHub

Submit the required plans, contractor licenses and valuation

04

Clear checksheets

Pay intake charges and address all review comments

05

Issue and inspect

Use approved plans and the permit inspection card

06

Close each record

Finish building, trade and fire finals for the actual scope

Permit fees and worked estimates

FINAL PP&D schedules effective July 10, 2026 set trade and valuation rates. Building review/process is 65% of the permit fee; electrical plan review is 25% when required. A 12% Oregon surcharge applies to building and trade permit fees. Commercial mechanical review is 60%. Project valuation includes labor/materials and applicable fair-market costs. PF&R is a separate schedule; its currently linked exhibit is dated July 1, 2019 and is not treated here as a newly adopted 2026 rate.

Three electrical branch circuits without a service/feeder, no plan review: $174 + 2 × $21 = $216 permit; 12% × $216 = $25.92 state surcharge; estimate $241.92. Required plan review would add $54; other permits are excluded.
One residential furnace: $91 item charge is below the $167 permit minimum; $167 + 12% × $167 = $187.04 estimate. Excludes electrical/gas scope, unusual review and extra inspections.
Three standard plumbing fixtures: 3 × $63 = $189 (above the $161 minimum); plus $22.68 state surcharge = $211.68. Excludes piping, complex review and other fees.
$10,000 building project: $332.13 permit + $215.88 review/process (65%) + $39.86 state surcharge (12% of permit) = approximately $587.87. Excludes site/zoning/fire, commercial development-service fees, SDCs, taxes and other permits.
TradePermit feeLicense fee
Residential electrical and service workJuly 10, 2026: first branch circuit without service/feeder = $174; each additional = $21. Three circuits: $216 + $25.92 state surcharge = $241.92; plan review adds 25% when required.Oregon CCB and BCD licensing schedules
Residential plumbing permitsJuly 10, 2026: standard fixtures/water heater $63 each, subject to $161 minimum permit; 12% state surcharge additional. Three fixtures: $189 + $22.68 = $211.68, before other scope.State contractor and plumbing credential schedules
Heating, cooling and ventilationJuly 10, 2026: residential furnace $91, heat pump $84, minimum permit $167. One furnace permit at the minimum + 12% surcharge = $187.04; electrical/gas scope additional.Oregon contractor and applicable specialty credential schedules
Sprinkler and alarm installationsPublished PF&R system schedules use valuation-based inspection + 65% plan review; fire charges are separate from PP&D. The linked PF&R exhibit is dated July 1, 2019; confirm the assessed current rate before budgeting.System-specific credentials; verify with the Fire permit center
Building and site coordinationJuly 10, 2026: $10,000 valuation = $220.85 + 8 × $13.91 = $332.13 building permit. 65% review and 12% state permit surcharge give approximately $587.87 before other charges.Oregon CCB licensing schedule

Homeowner work and trade credentials

Portland’s residential electrical guidance limits homeowner wiring to individually owned and occupied homes; it excludes rental, sale/lease/exchange properties and ADUs. Electrical contractors need CCB and BCD electrical licenses. The plumbing and mechanical pages allow recorded individual owners to perform their own work but exclude LLC ownership. Use the owner-doing-work statement where required.

Choose your permit route

Use the City Start Guide and project pages to distinguish residential, commercial, trade and site-development permits. Many applications use Development Hub PDX (DevHub), while some permit types have email or other submission instructions.

Submission checklist

Research the address or parcel, zoning and past permits in PortlandMaps.
Provide the work description, applicant, contractor information and project valuation.
Prepare applicable site, existing and proposed floor, elevation and structural plans.
Include required calculations, specifications or geotechnical documents for the project.

Application and review

Follow the selected permit’s submission route and pay intake fees to begin review. Respond to every checksheet item and resubmit corrected plans. After approval and pre-issuance review, pay the remaining charges and obtain the permit, approved plans and inspection card.

Codes, rules and local guidance

Use PP&D’s Codes, Rules and Guides page for Oregon construction codes, Portland regulations and discipline-specific interpretations. Select the material relevant to the proposed work; a narrow code guide does not establish the entire code set for every project.

Inspections and closeout

Use Schedule an Inspection and the permit inspection card to arrange the required stages. Keep the approved plans available, resolve corrections and obtain the applicable final approvals before treating the work as complete.

Official resources