Riverside Contractor Licensing & Permit Guide (2026)

Use the Public Permit Portal, prepare discipline documents and estimate FY 2026/27 permit components.

The skyline of downtown Riverside seen from near the top of Mount Rubidoux, with the Box Springs Mountains in the background. Downtown Riverside, Riverside, Riverside County, Calif
Photo: Z3lvs · CC0 · Resized for this guide.

Confirm current licensing, code editions, fees and project requirements with the issuing department before starting work.

Overview

Riverside City Building & Safety uses its Public Permit Portal for applications, plans, fees, issuance and inspection results. Check City jurisdiction rather than using Riverside County procedures.

Portal

Public Permit Portal — applications through inspections

Schedule

FY 2026/27 · July 1, 2026

Trades

Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.

Electrical circuits and EV charging

Riverside Building & Safety

Applicable Code

City-adopted California electrical requirements and local bulletins.

License Requirement

Appropriate CSLB electrical classification or verified owner-builder route.

License Fee

CSLB licensing schedule

CEUs

Credential renewal requirements

Permit Fee

FY 26/27 components: $41 issuance; residential EV charger $66; dedicated circuit $10. Other charges and applicable surcharges remain.

Plan Review Time

Use the City EV eligibility checklist and required load calculations.

Common Pitfalls

  • A charger fee does not cover every associated service alteration.
  • Do not omit the issuance component or applicable surcharges.

Permit-to-closeout workflow

01

Check property

Confirm Riverside City jurisdiction and intended use

02

Select scope

Building, trade, site and fire applications as needed

03

Prepare documents

Use City forms, site plan and discipline calculations

04

Submit portal

Upload plans and respond to reviewer comments

05

Issue and inspect

Pay invoices and arrange required stage inspections

06

Complete finals

Resolve corrections and occupancy requirements

Permit fees and worked estimates

FY 2026/27 schedule is offered as effective July 1, 2026. Its 14% general-plan/technology surcharge applies where appropriate; components below exclude that assessment and other charges.

One water heater up to 100,000 BTU with one gas vent: $41 plumbing issuance + $37 heater + $18 vent = $96 in listed base components. July 1, 2026 schedule. Excludes applicable 14% surcharge, additional piping, plan review, other permits and state/agency charges; final invoice controls.
TradePermit feeLicense fee
Electrical circuits and EV chargingFY 26/27 components: $41 issuance; residential EV charger $66; dedicated circuit $10. Other charges and applicable surcharges remain.CSLB licensing schedule
Water heaters, fixtures and pipingFY 26/27: $41 issuance; heater up to 100,000 BTU $37; gas vent $18; water closet $41.CSLB classification schedule
HVAC and ventilationFY 26/27: $41 issuance; furnace $49; residential exhaust hood $24; commercial hood $483.CSLB specialty schedule
Life safety and fire-system coordinationCurrent fire fee not verified; excluded from the worked example. Obtain the applicable fire review assessment; the building trade component example excludes fire fees.System-specific credential schedule
Building and owner-builder coordinationFY 26/27 lists $41 issuance and $341 building plan-check components; valuation and other charges affect totals.CSLB building classification schedule

Submission checklist

Describe the property, use and full scope.
Use City application forms and site-plan requirements.
Supply discipline calculations, contractor information or owner package.
Identify entitlement and fire review; use the at-risk form for concurrent entitlement/building review.

Homeowner and codes

Owners acting as builders use the City Property Owner’s Package. Use the City forms and bulletins for exemptions, equipment and the applicable adopted code; an owner signature does not waive professional-document or inspection requirements.

Inspections and closeout

Schedule and receive results through the Public Permit Portal. Keep the work accessible at the required stages, resolve corrections and obtain relevant final and occupancy approvals.