San Diego Contractor Licensing & Permit Guide (2026)

Prepare City of San Diego building submissions, permit issuance documents and inspection closeout.

City view of San Diego
Photo: Dirk Hansen · CC BY-SA 3.0 · Resized for this guide.

Confirm current licensing, code editions, fees and project requirements with the issuing department before starting work.

Overview

The City of San Diego Development Services Department (DSD) administers city building permits. San Diego County’s services cover a different jurisdiction; verify the property is within the City before choosing an application route.

Minor trade work

Simple MEP permits for listed eligible installations

Historic properties

Simple MEP route excludes historic districts/designations

Trades

Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.

Electrical and private-garage EV installations

San Diego DSD

Applicable Code

California electrical standards as adopted locally; use the current City code cycle and amendments.

License Requirement

CSLB C-10 electrical classification or another authorized license scope; qualifying owners follow DSD owner-builder verification.

License Fee

CSLB application and license schedule

CEUs

Check the specific state credential’s renewal obligations

Permit Fee

IB-103 May 2026: first five 15–45A circuits $176.57; circuits 6–10 add $52.39. Ten circuits = $228.96 inspection component; reviewed plans can add fees.

Plan Review Time

Listed minor electrical installations may use the online no-plan Simple Permit route.

Common Pitfalls

  • Historic districts and designated historic properties do not qualify for Simple MEP.
  • The listed EV charging scope is private garages; do not assume every EV project qualifies.

Permit-to-closeout workflow

01

Check property

Confirm City jurisdiction, historic status and development approvals

02

Choose review

Simple MEP, standalone trade, building or fire application

03

Prepare submission

Use DSD’s manual, plans and owner/contractor documentation

04

Clear issuance

Complete requested checklist items and pay invoiced charges

05

Inspect systems

Coordinate DSD, special inspections and Fire-Rescue where required

06

Complete finals

Resolve corrections and confirm occupancy approval

Permit fees and worked estimates

Rates come from May 2026 IB-103 (MEP), May 2026 IB-506 (fire) and August 2026 IB-501 (building). MEP amounts below are listed inspection components; standalone plans add applicable review charges. Building fees depend on use and area, not one universal percentage. Add applicable general-plan, mapping, state, records, impact and outside-agency charges to the components shown.

Ten 15–45A circuits: $176.57 for first five + $52.39 for circuits 6–10 = $228.96 inspection component. Excludes reviewed-plan fees, mapping where applicable and other required charges.
One furnace plus one HVAC condensing unit: $176.57 + $131.52 = $308.09 listed mechanical component. Excludes electrical permits, HERS/energy testing, plans and other charges.
New non-high-rise fire alarm with up to 20 devices: $353.13 plan check + $353.13 inspection = $706.26 component subtotal. Excludes additional systems/devices and optional services.
SDU/duplex addition/remodel through 500 sq ft using standard Table 501A: $3,512.92 review + $2,228.29 inspection + $737 General Plan + $12.16 mapping = $6,490.37 subtotal. Excludes state/seismic and records/collection fees, lead fees for pre-1978 structures, deposits, impacts, school fees and other permits; eligible rapid-review projects use a different row.
TradePermit feeLicense fee
Electrical and private-garage EV installationsIB-103 May 2026: first five 15–45A circuits $176.57; circuits 6–10 add $52.39. Ten circuits = $228.96 inspection component; reviewed plans can add fees.CSLB application and license schedule
Plumbing, gas repairs and water heatersIB-103 May 2026: water heater $122.97 each; gas system/leak repair first five outlets $264.25. Plan review and other required scope are additional.CSLB plumbing classification application / license schedule
Furnaces, air conditioning and exhaustIB-103 May 2026: first furnace/air handler $176.57, each additional $52.39; HVAC condensing unit $131.52 each. Separate electrical/HERS costs may apply.CSLB specialty license schedule
Fire suppression, alarms and underground systemsIB-506 May 2026: new non-high-rise alarm first 20 devices $353.13 plan check + $353.13 inspection = $706.26. Additional device blocks/system charges are extra.CSLB classification schedule plus any separate operational permit charges
Building and contractor coordinationIB-501 August 2026: SDU/duplex add/remodel through 500 sq ft $3,512.92 review + $2,228.29 inspection. General Plan $737 and mapping $12.16 give $6,490.37 subtotal before remaining charges.CSLB building classification schedule

Simple permits and owner-builder documentation

San Diego offers online no-plan Simple MEP permits for listed minor installations in single-dwelling units, duplexes and townhouses outside historic districts and without historic designation. The list includes certain circuit, equipment and piping work; tankless water-heater replacement is excluded. Owners doing the work or hiring separate contractors must provide the required owner-builder verification. Update contractor information for required projects before work begins or continues.

Choose your permit route

Use DSD’s Building Permit page to check permit exemptions and select the appropriate review service. Coordinate development approvals, separate trade work, construction changes and deferred submittals when the project requires them.

Submission checklist

Confirm the property, proposed work and required development approvals.
Use the applicable Project Submittal Manual requirements and DSD forms.
Prepare the required plans and supporting project documents.
For residential projects proposing two or more units, review the Affordable Housing Requirements Checklist identified on the Building Permit page.

Application and permit issuance

Use the City’s online permitting service, respond to plan-review comments and then supply the issuance documents requested by staff. Pay outstanding plan-check and issuance charges, and obtain the issued permit before starting permitted construction.

Codes and city amendments

DSD’s Codes and Regulations page links the California Building Standards Codes, San Diego Municipal Code and recent state and local regulations. Check local amendments and the application’s code-cycle requirements together; City guidance describes a transition for qualifying applications submitted before January 1, 2026.

Inspections and closeout

Follow DSD’s inspection scheduling instructions and prepare the site and approved documents for each required inspection. Coordinate fire and special-inspection approvals where required, resolve corrections and confirm final and occupancy approvals before using the completed space.