Washington Contractor Licensing & Permit Guide (2026)

Choose a DOB application route, prepare plans and coordinate construction inspections in the District.

City view of Washington, DC
Photo: Ralf Roletschek (talk) - Infos über Fahrräder auf fahrradmonteur.de Wikis in der Ausbildung · CC BY-SA 3.0 · Resized for this guide.

Confirm current licensing, code editions, fees and project requirements with the issuing department before starting work.

Overview

The District of Columbia Department of Buildings (DOB) manages construction permitting. This guide concerns properties in the District, rather than neighboring Maryland or Virginia jurisdictions.

Permit authority

DC Department of Buildings (DOB)

Trade licensing

DLCP Board of Industrial Trades

Trades

Select a trade for its permit path, licensing, code resources, fees and filing pitfalls.

Electrical permits and licensing

DOB / DLCP

Applicable Code

2014 NEC within the 2017 DC suite, with DC electrical supplement and later amendments; confirm Title 12 for the application.

License Requirement

DC-licensed, bonded master electrical professional obtains the trade permit. A trade contractor company also needs its DLCP credential and designated master.

License Fee

DLCP Industrial Trades fee schedule

CEUs

Confirm current renewal requirements with DLCP

Permit Fee

Outlet wiring: $20 per 10 outlets or fraction, plus 10% enhancement.

Plan Review Time

Confirm the selected trade route with DOB

Common Pitfalls

  • A homeowner cannot apply for the electrical trade permit.
  • A building application does not replace the licensed master’s electrical application.

Permit-to-closeout workflow

01

Confirm scope and approvals

Identify residential/commercial route, zoning, neighboring-property impacts and required trades.

02

Submit the application

Use Permit Wizard or Citizen Access and the applicable DOB checklist.

03

Complete digital review

Upload drawings to ProjectDox and address each reviewing agency’s comments.

04

Obtain issued permits

Pay assessed charges and have licensed masters obtain required trade permits.

05

Arrange inspections

Use Tertius and resolve inspection corrections for the issued scope.

06

Confirm occupancy approval

Check whether a certificate of occupancy is required before using the finished space.

Permit fees and worked estimates

DOB published fee schedule checked October 12, 2026; no effective date shown. Examples include the 10% enhancement; permit charges only.

20 outlet wiring points: 2 × $20 × 1.10 = $44.
3 ordinary plumbing fixtures: ($26 + 2 × $20) × 1.10 = $72.60; instant route instead $85.80.
50 NFPA 13 sprinkler heads: 50 × $4 × 1.10 = $220.
Excluded: separate trades, green-building, occupancy, repeated review and private inspection charges.
TradePermit feeLicense fee
Electrical permits and licensingOutlet wiring: $20 per 10 outlets or fraction, plus 10% enhancement.DLCP Industrial Trades fee schedule
Plumbing and gas-fitting permitsOrdinary plumbing: $26 first fixture + $20 each additional, plus 10%; instant route $28.60/fixture.DLCP schedule for the license and application category
Mechanical and refrigeration workInstant HVAC up to 10 tons: $46 + 10% = $50.60; gas work separate.DLCP refrigeration/air-conditioning fee schedule
Fire protection and life safetyNFPA 13: $4/head first 50, $2/head thereafter, plus 10%; alarm $22/10 devices.Credential-specific; confirm with DLCP and the reviewing office
General contracting and residential renovationsInstant building permit: $36.30 enhanced; new construction $0.03/cubic foot plus 10%.DLCP contractor and construction-services schedule

Choose your permit route

Start with DOB’s How to Get a Permit guidance to identify the permit type and required approvals. The Permit Wizard handles one- and two-family residential projects and qualifying trade applications. Other commercial projects use Citizen Access. Some projects require approvals from other agencies.

Submission checklist

Confirm the property, work scope and residential or commercial application route.
Use the applicable DOB checklist and cover-sheet templates.
Prepare the required construction drawings for digital review in ProjectDox.
Identify zoning and other agency approvals before submitting.

Application and review

Apply through the appropriate DOB portal.
Upload the required documents and respond to plan-review comments.
Pay assessed permit charges and obtain the issued permit before beginning permitted work.

Contact and planning

Use DOB’s official contact service or call (202) 671-3500 for permitting assistance. Ask DOB to resolve scope-specific requirements before committing to a construction start date.

Codes and District amendments

DOB identifies the 2017 DC Construction Codes as the 2015 ICC family, 2014 NEC and ASHRAE 90.1-2013 with District supplements. The integrated reference books omit some amendments adopted after May 29, 2020: use Title 12 DCMR to confirm the official provisions and transition conditions for the application.

Homeowner rules

The Homeowner’s Center serves owners of one- and two-family homes and authorized agents. It assists with project applications and plans; electrical, plumbing and mechanical trade permits are issued only to licensed, bonded master professionals. Keep the owner application and each contractor’s trade responsibilities clear.

Enforcement and neighboring properties

DOB’s illegal-construction request service can be used to report suspected unpermitted work.
Check neighbor-notification requirements before excavation, underpinning or work affecting a party wall.
Keep the permitted scope aligned with the work; ask DOB about revisions when the design changes.

Inspections and closeout

DOB directs construction inspection scheduling through Tertius. Review the required inspections for the issued permit and any certificate-of-occupancy requirements before using the completed space.